This project,
encompassing construction and rehabilitation from Byron to
San Jose, was the continuation of the original South
Bay Aqueduct/Pipeline rehabilitation project.
To complete
this project Syblon Reid:
- Constructed the addition of over 30 manholes
- Added continuity bonds to over 15 miles
of pipeline
- Recoated the interior of existing,
54-inch, 60-inch, and 72-inch pipeline
- Performed tank piping and structural modifications
- Performed soil nailing and slope stability
improvements
- Replaced over 50 Automatic Relief Valves
(ARV) and blow-off piping systems
- Performed extensive Asbestos remediation
|
|

Syblon Reid completed these critical
outages ahead of schedule, which included additional scope
of work
|