|
Location: Sacramento, CA
Installation of 84" welded steel water line with tie-ins including bore-and-jack locations.
Challenges on this project included installation at depths up to 55' deep with significant vertical and horizontal transitions to support bore-and-jack connections. This project was completed with zero worker injuries or accidents.
  
|