The City of Roseville chose Syblon
Reid to construct a new reclaimed water storage tank, pumping
plant, reclaimed and potable water main pipeline.
Technical elements of this project included:
- 24,800 linear feet of 12" inch to 16"
inch reclaimed and potable main
- 5 million gallon reclaimed water storage
tank
- Three 6" inch vertical turbine pumps
- Three 8" inch vertical turbine pump
|
|
 |