|
The Nevada Irrigation District
(NID) required the expansion of their existing water treatment
facility in Auburn, California. NID chose Syblon Reid to construct
a new up-flow clarifier, add a backwash recovery system and
pump station, upgrade all chemical feed systems, replace the
filter controls and operational valves, and upgrade all electrical
and instrumentation services to the existing plant.
Syblon Reid maintained consistent
planning coordination with the District's operations staff
to ensure all construction elements of this project were performed
effectively in this highly confined and congested site space.
|