Hoffman Co. saved phase five of
the Los Lagos project in Placer County, California until the
end for a reason it was the most difficult of the phases.
The major challenges included rocky conditions and the time
frame given to complete the project. The contract was signed
August 22nd and the completion date was scheduled for December
of the same year.
|
|
 |
In just four months, Syblon Reid developed the infrastructure
for this sixty-acre subdivision. The project required:
- Two and a half months of rock blasting adjacent
to Auburn-Folsom Road
- Clearing and mass grading
- A joint utility trench with 10,000 lineal feet
of storm drains and sewer and water lines
- The expansion of Auburn-Folsom Road to accommodate
traffic needs including curbs, gutters, and paving
|