Colgate Penstock Valve Replacement
About Us
Project Services
Current Projects
Safety
Press
Careers
Forms
Contact Us

Location: Yuba County, CA

A hydro project, scope of work consisted of installation of a 14' Diameter Valve in the penstock serving Colgate Powerhouse which is located at the end of a six mile tunnel which conveys water from Bullard's Bar Reservoir. This system supplies water for power generation with a head of over 600'.

A major challenge of the project was the large diameter pipe and installation of the 14' valve. Work was completed during specific shut-down periods to accommodate the client's needs.

This project was selected as a finalist for a 2009 Associated General Contractors of California (AGC) Constructor Award for Excellence in Project Management.

 

Colgate Penstock Valve ReplacementColgate Penstock Valve ReplacementColgate Penstock Valve ReplacementColgate Penstock Valve Replacement
Colgate Penstock Valve Replacement

 