Three Rivers Levee Pump Station
Location: Marysville, CA
Working as a subcontractor as part of the 5 mile levee set-back project outside Marysville, Syblon Reid is constructing a storm water pump station consisting of a cast-in-place structure with 4 – 150HP mixed axial flow pumps and their electrical components. Scope of work also includes installing 3800' of 36" HDPE connecting the pump station to an outlet structure on the river side of the levee.