Metro Air Park Water Tank & Booster Station

Location: Sacramento, CA

A public works project, the main scope of work includes installation of a 2.5 million gallon welded steel water tank, a booster pump station, and construction of a 3,000 SF control building with a sodium hypochloride injection system. Associated work includes site grading with lime treatment, construction of 2 surge tanks and a standby generator room with above ground fuel tanks, 4 flow measuring and valve control vaults with piping, and installation of 6 booster pumps including 4-125 hp pumps.

Project challenges include making 10 interconnections to an existing 24" watermain running directly underneath the site and complying with strict environmental requirements.

 

 



[top]
home | about us | project services | press | careers | forms | contact us


© 2003-2006 Syblon Reid, General Engineering Contractors
PO Box 100, Folsom, CA 95763 | 916.351.0457 | srco@srco.com