Home
Current Projects
About Us
Project Services
Current Projects
Safety
Press
Careers
Forms
Contact Us

El Dorado Hills WWTP

Location: El Dorado Hills, CA

For a public works client, the project is an expansion of an existing water treatment plant from 19 million gallons to 26 million gallons per day. Scope of work includes installing a chemical feed system to replace an existing chlorine gas system, complete control SCADA replacement, installation of raw water intakes in Folsom Lake, construction of a 400,000 gallon water storage tank, and construction of a 580’ long retaining wall.

A major challenge of the project is completing all work while not impacting the water distribution needs of the client.

 

El Dorado Hills WWTP El Dorado Hills WWTP El Dorado Hills WWTP

 

 



[top]
home | about us | project services | press | careers | forms | contact us


© 2003-2006 Syblon Reid, General Engineering Contractors
PO Box 100, Folsom, CA 95763 | 916.351.0457 | srco@srco.com